REMODELING PROGRESS - |
|
|
WHAT
A RUNAWAY TOILET CAN DO TO THE INSIDE OF YOUR HOME |
|
FRIDAY
- APRIL 21, 2006 |
| Danny continues
to lay tile. |
| |
 |
|
 |
|
 |
 |
 |
 |
 |
|
THURSDAY
- APRIL 20, 2006 |
| Below Danny
sets up the tile pattern again. While Getso cuts tile and prepares
the quick set. |
 |
 |
 |
 |
 |
| Below Danny
puts down the stretching compound (red) on all the crackes. |
 |
 |
 |
 |
 |
|
WEDNESDAY
- APRIL 19, 2006 |
| Danny &
Getso with Ambassador Flooring removes all the tile and quick set
to lay the new tile down. |
 |
 |
 |
 |
 |
|
TUESDAY
- APRIL 18, 2006 |
| Ambassador
Flooring prepares to do the demolition of covering as much as they
can, removing floor molding and gets ready to remove the floor tile
that was laid the second week of December 2005. |
 |
 |
 |
 |
 |
|
| Below the
floor tile was laid, Terese notice a difference in die-lot color.
Brad came out today to assess the situation and will get back with
us. |
 |
 |
|
 |
 |
|
| Dennis
finishes painting around the wall where the hot water heater,
washer & dryer go. Still more painting to do. Tomorrow Dennis
reconnects the hot water heater, and then connects the washer
& dryer on Saturday (Dec. 17). |
| |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
| Oliver and
crew from Access Interiors install all the floor tile in the kitchen,
hallway, utility room and bathrooms. Also our marble sinks are finally
installed in our bathrooms. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
 |
 |
 |
|
 |
|
 |
|
Winter
at our house during our remodeling. |
| |
 |
|
 |
|
|
Andrew
installs the Fire Door to the garage. |
| |
 |
|
 |
|
|
Jose
& Dave install the sile stone counter tops in the Kitchen.
Prior to this Dennis & Terese painted the new doors and door
jams. You can see the new doors in some of the pictures below.
Jose says that this one of the biggest installs he's had with
almost 90 sq. ft of sile stone. This is imported from Spain where
it is made. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|
| Cal,
Nate & Mac install all interior doors but one. The fire door
was damaged in shipment and a new is ordered and should be in
by Tuesday, November 29. Now I just got some more painting to
do. |
 |
|
 |
|
 |
 |
 |
 |
 |
 |
|
|
 |
 |
 |
 |
 |
 |
 |
 |
|
Joe
makes template for the sile stone counter tops. |
| |
 |
|
 |
|
|
Ryan
installs new kitchen cablinets. |
| |
 |
|
 |
|
 |
 |
 |
 |
 |
| |
|
 |
|
|
|
The
old cabinets and bathroom vanities being removed in preparation
of the new cabinet being installed October 24. |
 |
 |
 |
 |
 |
 |
|
 |
|
 |
|
Removing
the tile and linoleum from the Kitchen and Family Rooms. What
a job!!! John De' and wife Marie are helping us. We still have
to remove the linoleum from the Utility Room and remove all residue
adhesive and then we're ready from the flooring. |
 |
|
 |
<— Marie De' using
a vibrating scrapper to remove the linoleum and leftover tile adhesive.
|
 |
|
| Lost track of the
days. But I have spent some days painting. I have painted the living
room green but don't have a picture of it yet. |
 |
|
 |
|
 |
|
| The removal of the
back splash in the kitchen was easy. I just need to feather a light
coat of mud now, and paint to seal. Eventually there will be a stainless
steel back splash when finished. |
| Dennis
removes the back splash in his kitchen by the flat-top stove.
—> |
|
A lot of
time is spent doing shopping for material and setting up dates
for installing of our project. |
|
< —
Dennis removes the back splash in his kitchen by the flat-top
stove. |
|
 |
|
 |
|
 |
 |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|
| Guest
Bedroom: The walls between the closets are removed ; Popcorn
is scraped from ceiling and the carpet tack strips and baseboards
are removed. Guest Bedroom/Master Bedroom: The framing
for the new closet and installed and sheet-rock added along with
mudding all the areas to prepare the ceiling for mud spitting.
Also the tack strips and baseboards are removed in the Master
Bedroom. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Our
bedroom moved to the livingroom |
|
|
|
|
|
|
JULY
30, 2005 - WE INSTALL A NEW AC UNIT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
<—
New AC being lowered on roof.
July 30, 2005 |
|
—>
New AC being lowered on roof.
July 30, 2005 |
|