April 21, 2006

DENNIS & TERESE FARRAR

are

A REMODELING PROJECT
Come on in and watch our face lift!
CLICK THUMBNAIL TO SEE LARGE PICTURE
- REMODELING PROGRESS -

WHAT A RUNAWAY TOILET CAN DO TO THE INSIDE OF YOUR HOME

FRIDAY - APRIL 21, 2006
Danny continues to lay tile.
  Hallway ready for tile   Lots of empty boxes; that's a good thing!  
Danny continues to lay tile Danny continues to lay tile Danny continues to lay tile Danny continues to lay tile Danny continues to lay tile

THURSDAY - APRIL 20, 2006
Below Danny sets up the tile pattern again. While Getso cuts tile and prepares the quick set.
Danny starts to lay tile Getso mixes quick set Danny starts to lay tile Danny starts to lay tile Danny starts to lay tile
Below Danny puts down the stretching compound (red) on all the crackes.
Prepaing floor Prepaing floor Prepaing floor Prepaing floor What didn't fit in the garage

WEDNESDAY - APRIL 19, 2006
Danny & Getso with Ambassador Flooring removes all the tile and quick set to lay the new tile down.
Old quick set need to be removed Old quick set need to be removed Old quick set need to be removed Old quick set need to be removed Old quick set need to be removed

TUESDAY - APRIL 18, 2006
Ambassador Flooring prepares to do the demolition of covering as much as they can, removing floor molding and gets ready to remove the floor tile that was laid the second week of December 2005.
Getso removes floor molding Plastic and paper helps protect new cabinets from damage Plastic and paper helps protect new cabinets from damage Plastic and paper helps protect new cabinets from damage Plastic and paper helps protect new cabinets from damage

Below the floor tile was laid, Terese notice a difference in die-lot color. Brad came out today to assess the situation and will get back with us.
Different dielot Different dielot   Different dielot The notice at Home Depot clearly states that you "need to mix tiles from all boxes."

Dennis finishes painting around the wall where the hot water heater, washer & dryer go. Still more painting to do. Tomorrow Dennis reconnects the hot water heater, and then connects the washer & dryer on Saturday (Dec. 17).
 

Oliver and crew from Access Interiors install all the floor tile in the kitchen, hallway, utility room and bathrooms. Also our marble sinks are finally installed in our bathrooms.
 
   

Winter at our house during our remodeling.
     

Andrew installs the Fire Door to the garage.
     

Jose & Dave install the sile stone counter tops in the Kitchen. Prior to this Dennis & Terese painted the new doors and door jams. You can see the new doors in some of the pictures below. Jose says that this one of the biggest installs he's had with almost 90 sq. ft of sile stone. This is imported from Spain where it is made.

Cal, Nate & Mac install all interior doors but one. The fire door was damaged in shipment and a new is ordered and should be in by Tuesday, November 29. Now I just got some more painting to do.
   

Joe makes template for the sile stone counter tops.
     

Ryan installs new kitchen cablinets.
     
       

The old cabinets and bathroom vanities being removed in preparation of the new cabinet being installed October 24.
   

Removing the tile and linoleum from the Kitchen and Family Rooms. What a job!!! John De' and wife Marie are helping us. We still have to remove the linoleum from the Utility Room and remove all residue adhesive and then we're ready from the flooring.
  <— Marie De' using a vibrating scrapper to remove the linoleum and leftover tile adhesive.

Lost track of the days. But I have spent some days painting. I have painted the living room green but don't have a picture of it yet.
   

The removal of the back splash in the kitchen was easy. I just need to feather a light coat of mud now, and paint to seal. Eventually there will be a stainless steel back splash when finished.
Dennis removes the back splash in his kitchen by the flat-top stove. —>
A lot of time is spent doing shopping for material and setting up dates for installing of our project.
< — Dennis removes the back splash in his kitchen by the flat-top stove.

   
 

Guest Bedroom: The walls between the closets are removed ; Popcorn is scraped from ceiling and the carpet tack strips and baseboards are removed. Guest Bedroom/Master Bedroom: The framing for the new closet and installed and sheet-rock added along with mudding all the areas to prepare the ceiling for mud spitting. Also the tack strips and baseboards are removed in the Master Bedroom.


Our bedroom moved to the livingroom

JULY 30, 2005 - WE INSTALL A NEW AC UNIT
<—
New AC being lowered on roof.
July 30, 2005
—>
New AC being lowered on roof.
July 30, 2005

These pages were created for those who would like see our construction project. I hope that all who visit the pages on this site will enjoy